What’s in a Lot?

Here’s a challenge from Eran Ben-Joseph: name a great parking lot.

Couldn’t do it, could you? Neither could I, and neither could Ben-Joseph. In a new book ReThinking a Lot: The Design and Culture of Parking he explores the horribleness of all that space that car drivers demand. If you look at North American cities in the 60s and 70s all you’ll see is a giant slab of pavement for automobiles instead of people. Today, those cities are dealing with the car-created destruction.

Where’s the good news in this? Well, Ben-Joseph’s book is all about finding ways to make these wastes of space practical and helpful to the areas around them. Some solutions might be to design a parking lot to serve the local community or to make these parking spots actually green.

So what can be done to make parking lots greener and better integrated into their civic surroundings? Ben-Joseph recommends a menu of ideas to improve parking lots according to their settings — which he regards as “a healthier approach to planning, rather than giving prescriptive ideas about how to design them.”

For one thing, planners might simply plant trees throughout parking lots, as the architect Renzo Piano did at Fiat’s Lingotto factory in Turin, Italy. Low-use parking lots need not be entirely paved in asphalt, either: Miami’s Sun Life Stadium features large areas of grass lots that are environmentally better year-round.
“The whole space does not have to be designed the same way,” Ben-Joseph says. “Overflow parking can be designed differently, and not paved with asphalt.”

Lots can also incorporate green technology. Some parking spaces in Palo Alto, Calif., have charging stalls for electric vehicles. A Walmart parking lot in Worcester, Mass., has 12 wind turbines that generate clean electricity for the store. The Sierra Nevada Brewery parking lot in Chico, Calif., has solar panels built into its lattice structure.

Read more at Physorg.

Madrid Turned a Highway into a Park

Madrid made a very wise urban planning decision and buried a highway to make room for people and nature. Thanks to a lack of foresight, the Rio Manzanares was surrounded by concrete and industrial spaces that made for depressing scene. The smart people in Madrid decided to change that and make the area along the river a place for people to enjoy and bring back nature to the space.

They added more pedestrian space, bike lanes, and room for public transit. To make things even better they supported surrounding buildings in sustainable renovations to improve their carbon footprint!

Here’s a great video explaining what they did and how the project drastically improves the city:

The planning management of the project was first sub-divided into two phases due to its technical complexity and the high amount of investment required to complete the project. The two phases focused on different objectives which were:
1. Madrid Calle 30 (Phase 1) – to bury the M-30 highway, and
2. Madrid Río (Phase 2) – to treat the area surrounding the river by building parks, playgrounds, infrastructure, and other facilities.

…
In a project as big as this one, the objectives were met step-by-step through smaller projects that were carried out to focus on specific areas that would be affected. For example, one project would deal with the areas of Casa de Campo and Manzanares districts, while another would execute the project in areas of Palacio-Puerta del Angel districts. The planning of many focused projects such as these under one big project, displays the work breakdown structure (WBS) of the whole project as well as the divergence and convergence of the work paths that would occur in the process.

Read more here

The Future of Transit: Gondolas

The Gondola Project is all about bringing fast and cheap public transit to cities by using (what else?) gondolas! Some people may think that gondolas are only for ski resorts or tourists but there’s a lot of growing interest around the world in using gondolas as an alternative to light rail and to get public transit to place it otherwise can’t get to.

There are many advantages of using gondolas from the small footprint (you can run them down the medians of highways) to their ability to cover vertical distance easily. Even the very flat city of London has a suspended cable car system under construction!

Here’s a video called “Aerial Ropeway Transit: Exploring its Potential for Makkah”:

U of T Research Contributing to Makkah’s Transportation Development from Colin Anderson on Vimeo.

The Toronto Star recently ran an article on exploring gondolas in Toronto and how other cities are exploring the idea.

A gondola doesn’t offer the same capacity as a subway but it could move 5,000 to 6,000 passengers an hour, “which is good compared to a streetcar line,” said Shalaby.

The Queen streetcar line carries about 1,800 people per hour at its busiest point in the morning peak, according to the TTC. That’s compared with about 30,000 on the Yonge subway, 2,100 on the Spadina streetcar and 200 to 300 on a neighbourhood bus route.

Meantime, Vancouver is releasing a business case in January for a gondola that would transport commuters up Burnaby Mountain to Simon Fraser University and a nearby residential development.

“Because it’s on top of a mountain, it gets snow before ground level. Right now we serve the university with very large articulated buses that have to go up and down that hill. There are 10 to 15 days a year they can’t make it to campus because road conditions are so poor,” said Ken Hardie, spokesman for TransLink.

Read the rest of the article.

‘Electric Highway’ Infrastructure Goes Live

The first location in what will be a series of fast-charging stations for electric and hybrid vehicles as officially opened in Washington State. Consumers cite concerns over how far electric vehicles can drive before char gins as a reason they won’t by electric cars (even though this is a none issue for the vast majority of commuters). With more stations where people can quickly charge their autos this distance issue will go away.

AeroVironment plans to install six stations every 64 to 97 kilometers along I-5 in shopping malls, fueling stations and restaurants with easy access to the highway. Three more stations will be built along U.S. Highway 2 to the north and potentially two more along Interstate 90, near Seattle.

2012 will be a pivotal year for electric vehicles such as the Nissan Leaf and plug-in electric hybrids such as the Chevy Volt. General Motors had high hopes for the Volt in its first full year on the market, but the company expects to miss its sales target of 10,000 cars in 2011, coming up short by more than 3,800, according to Bloomberg. Sales were stronger toward the end of the year. The company is expanding its annual production to 60,000 vehicles starting next month, even as the U.S. National Highway Traffic Safety Administration (NHTSA) investigates lithium-ion battery-pack fires following tests designed to measure the vehicle’s ability to protect occupants from injury in a side collision. Neither Nissan nor Tesla Motors—both of which sell all-electric vehicles powered entirely by lithium-ion batteries—have reported any fires in either the LEAF or Roadster, respectively.

You can always read more.